Mining Farm Area: 4000㎡ | Total Power Load: 15OMW | Operating Power Load: 82.5MW

Ohio data center has 40,000 square meters of floor space, with an operating power load of 82.5MW, and can host up to 30,000 Bitcoin mining machines. The data center is fully staffed with an experienced operations and mining machine maintenance team, who have multiple years of experience operating crypto-mining datacenters.

finalminingfarmtour4k cover

24/7 uninterrupted cooling and stable operation

A mining facility design perfected through years of experience, featuring excellent hot and cold air separation and ventilation, optimal spacing, air intake on both sides.